Electric bed bases

Electric Adjustable Bed Base Manufacturer & OEM Factory

KCAI builds electric adjustable bed bases for OEM and private-label programs. Choose the motor system, structure and control that fit your target market — from flat-pack e-commerce to retail split-king.

Electric bed bases

What Is an Electric Adjustable Bed Base?

An electric bed base articulates the head and foot of the mattress using linear actuators, letting users raise and lower the sleeping surface for comfort, reading or relief positions.

Electric bed bases

Motor Configurations by Tier

Select the motor count that matches your price point and feature set — from a simple single-motor base to fully articulated multi-motor systems.

  • Single motor — entry-level head lift
  • Dual motor — independent head and foot adjustment
  • Triple motor — additional articulation for premium models
Electric bed bases

Structure Options: Foldable, Flat-Pack and Split

Structure design drives both shipping cost and assembly experience. We offer fixed, folding and disassemblable flat-pack frames to suit your channel.

  • Foldable with surround frame — compact storage and shipping
  • Flat-pack disassemblable — lowest parcel shipping cost
  • Split configurations — for king and split-king programs
Electric bed bases

Materials, Load Rating and Durability

Carbon steel frames with wood side panels provide a stable base. Load capacity and durability are validated through in-house testing.

Electric bed bases

Certifications for Target Markets

Compliance support for US, EU, UK and AU markets. Certification numbers and scopes are being compiled and will be listed per product.

Electric bed bases

Packaging and Container Loading

Flat-pack and folding designs reduce freight cost. Cartons, pallets and container loading plans are engineered to your shipping method.

FAQ

Frequently asked questions

What motor options are available?

Single, dual and triple motor configurations, with OKIN motors optional on select models.

Can you make a split-king base?

Yes — split configurations are available for king and split-king retail programs.

Do you offer flat-pack bases for e-commerce?

Yes, the KD010-A2 is a disassemblable flat-pack base designed for parcel shipping.

What is the load capacity?

Load capacity is a temporary placeholder and will be confirmed per model before order.

Electric bed bases

Get Price & Specs

Get Price & Specs ↗