KD001-A3Comfort, with
more possibilities.
Explore our adjustable bed frames, electric mattresses, integrated smart beds and leisure chairs.
KD001-A3
KD004-B1Electric Adjustable Mattress
A flexible lift mattress designed to fit an existing bed board.
Explore product↗
KD005-A1Five-Zone Adjustable Bed Base
Five-zone electric adjustment with independent mattress and base movement.
Explore product↗
KD008-A1Multifunctional Electric Bed Frame
Versatile adjustable frame with optional German OKIN motor.
Explore product↗
KD010-A2Disassemblable Electric Bed Frame
A practical electric base designed for compact packing and easier transport.
Explore product↗
KD011-A3Folding Electric Bed Frame
A foldable electric base that helps simplify storage and transport.
Explore product↗
KR001Integrated Smart Adjustable Bed
An integrated mattress and adjustable bed in a clean one-piece design.
Explore product↗
KR002Breathable Smart Adjustable Bed
A one-piece adjustable bed with a breathable 3D mattress surface.
Explore product↗
KR003Split Smart Adjustable Bed
Split head adjustment and a lightweight honeycomb support plate.
Explore product↗
KR004Natural Latex Smart Adjustable Bed
A king-size integrated adjustable bed with a natural latex mattress.
Explore product↗
YJ001-1Yoga Zero-Gravity Recliner
A zero-gravity recliner with a stretch position for leisure and wellness.
Explore product↗