Smart beds

Smart Adjustable Bed Manufacturer & Motion Sleep OEM

KCAI builds smart adjustable beds with integrated control and connected sleep features. Our KR series combines articulated frames with integrated, split, breathable and latex mattresses for premium sleep brands.

Smart beds

The KR Smart Bed Series

Four smart bed configurations cover the premium end of the adjustable bed market, each pairing a motorized frame with a purpose-built mattress.

  • KR001 — integrated bed and mattress in one package
  • KR002 — 3D breathable mattress for airflow and comfort
  • KR003 — split smart bed with honeycomb plate and full-wrap head-lift
  • KR004 — natural latex mattress for premium comfort
Smart beds

Control System and App

Smart beds support app control alongside the wired remote, with memory presets and connected control as configurable options. App branding is available for your label.

  • App control via KANG CAI SMART APP
  • Wired remote standard, wireless optional
  • App branding and control-system ODM
Smart beds

Smart Sleep and Motion Features

We configure motion and comfort features to your spec. Feature availability is verified per model before production — we only ship what is tested.

Smart beds

Certifications and Compliance

Smart beds with connected control are supported for compliance in target markets. Certification scope is being compiled and will be listed per model.

Smart beds

OEM and ODM for Smart Bed Brands

From control-system integration to mattress selection, we engineer the smart bed your brand can sell — branded, packaged and ready for market.

FAQ

Frequently asked questions

Do your smart beds support app control?

Yes, smart beds support the KANG CAI SMART APP with wired remote as standard.

Can you brand the app for my company?

Yes, app branding and control-system ODM are available.

What mattress types are available?

Integrated, 3D breathable, honeycomb-plate split and natural latex mattresses.

Are smart features verified before shipping?

Yes — we only ship features that have been tested in-house.

Smart beds

Talk to Engineer

Talk to Engineer ↗