KD001-A3
Shaping the
future of sleep.
Adjustable beds and smart sleep products, thoughtfully developed for brands and homes around the world.
Designed around
better living.
Explore adjustable bed frames, integrated smart beds, mattresses and leisure seating for your next collection.
KD001-A3
KD004-B1Electric Adjustable Mattress
A flexible lift mattress designed to fit an existing bed board.
Explore product↗
KD005-A1Five-Zone Adjustable Bed Base
Five-zone electric adjustment with independent mattress and base movement.
Explore product↗
KD008-A1Multifunctional Electric Bed Frame
Versatile adjustable frame with optional German OKIN motor.
Explore product↗
KD010-A2Disassemblable Electric Bed Frame
A practical electric base designed for compact packing and easier transport.
Explore product↗
KD011-A3Folding Electric Bed Frame
A foldable electric base that helps simplify storage and transport.
Explore product↗
KR001Integrated Smart Adjustable Bed
An integrated mattress and adjustable bed in a clean one-piece design.
Explore product↗
KR002Breathable Smart Adjustable Bed
A one-piece adjustable bed with a breathable 3D mattress surface.
Explore product↗
KR003Split Smart Adjustable Bed
Split head adjustment and a lightweight honeycomb support plate.
Explore product↗
KR004Natural Latex Smart Adjustable Bed
A king-size integrated adjustable bed with a natural latex mattress.
Explore product↗
YJ001-1Yoga Zero-Gravity Recliner
A zero-gravity recliner with a stretch position for leisure and wellness.
Explore product↗Why partner
with Kang Cai?
Product development and manufacturing support shaped around the needs of your brand.
Meet our team ↗Manufacturing experience
Established in 2004, with 25,000 m² of manufacturing space in Dongguan.
Product development
A team of 50+ engineers supports product design and OEM / ODM customization.
Quality in every detail
Ask our team about available testing records and market-specific compliance documents.
Smart sleep for
different needs.
Explore product directions for hospitality, furniture brands and in-home comfort.
KANG CAI · DONGGUAN FACTORYExperience behind
every detail.
Based in Shatian Town, Dongguan, Kang Cai brings product development, manufacturing and OEM / ODM support together for adjustable beds and smart sleep products.
From factory floor
to finished comfort.
A look at Kang Cai's Dongguan facility, production workshop and product showroom.



Motion built into
the details.
A closer look at adjustable structures and configurations across the current range. Available functions depend on model.

Powered head and leg lift
The KD008-A1 supports independent backrest and leg adjustment. Confirm exact movement range and options by model.

Designed for compact handling
The KD011-A3 frame folds in half to support more convenient storage and transport.

Independent head sections
The KR003 allows the left and right head sections to adjust independently.
Ideas made
tangible.
Selected patent documents published on Kang Cai's official website. These are product patents and design rights, not third-party quality certifications. Ask our team for documents relevant to your market and product.
View company information on kcaibedtech.comMade in Dongguan.
Ready for the world.
Supporting adjustable sleep product programs for partners across Europe, North America and Asia.
Tell us what you're
looking to create.
Share a product idea, project brief or sourcing requirement with our team.

