PACKAGING & LOGISTICS

Adjustable Bed Packaging & Logistics

Packaging decides both your landed cost and your damage rate. We match packaging to your lane — retail pallet, e-commerce parcel, or mixed container.

PACKAGING & LOGISTICS

Match packaging to the lane

Each shipping lane has a different risk profile, so packaging is matched before production.

Retail

Bulk carton on pallet

Protection on the pallet — for showroom and in-store delivery.

E-commerce

Flat-pack or foldable, retail box

Doorstep damage and unboxing are the key concern for parcel lanes.

Mixed container

Mixed cartons, tight loading

Cube and load optimization across frames, smart beds and recliners.

PACKAGING & LOGISTICS

How KCAI lowers your freight and damage

Four ways the design and planning stage reduces landed cost.

  • Flat-pack disassemblable and foldable frame designs cut box dimensions.
  • Container cube is planned from accurate per-model carton dimensions.
  • Packaging is matched to your actual carrier lane before full production.
  • FOB Shenzhen terms keep the shipping hand-off clear.
FAQ

Frequently asked questions

How do I lower e-commerce freight?

Choose a flat-pack or foldable base — reducing box dimensions is the single biggest lever on parcel freight.

Can I mix different models in one container?

Yes — frames, smart beds, and recliners can share a container when the load is planned for weight and stacking.

What are your shipping terms?

Our standard terms are FOB Shenzhen, with packaging matched to your retail or e-commerce lane.

PACKAGING & LOGISTICS

Plan your shipping

Get shipping details ↗