KD008-A1 Multifunctional Frame
BED FRAMES · OEM / ODM

KD008-A1 Multifunctional Electric Bed Frame – 2000 × 900

A multifunctional electric bed frame designed for adaptable comfort and production flexibility. Ask our team about available fabric, motor and configuration options.

  • Backrest lift 0–60° and leg lift 0–40°
  • High-strength steel structure
  • 15 / 18 mm eco plywood slats
  • Optional German OKIN motor; 10,000-cycle tested
Request a quote ↗
ModelKD008-A1
CategoryBed frames
Size2000 × 900 mm
CustomizationOEM / ODM available
MADE FOR YOUR PROGRAM

Talk through the details.

Contact our team to discuss specifications, available options, samples and production requirements.

Ask about KD008-A1 ↗