KD011-A3 Foldable with Surround Frame
BED FRAMES · OEM / ODM

KD011-A3 Folding Bed Frame – Foldable with Surround Frame, 2000 × 900

A folding electric bed frame with a surrounding frame design. The fold-in-half structure supports more convenient storage and transport without giving up powered adjustment.

  • Backrest lift 0–60° and leg lift 0–40°
  • Frame folds in half for storage and transport
  • 15 / 18 mm eco plywood slats
  • 10,000-cycle lift endurance tested
Request a quote ↗
ModelKD011-A3
CategoryBed frames
Size2000 × 900 mm
CustomizationOEM / ODM available
MADE FOR YOUR PROGRAM

Talk through the details.

Contact our team to discuss specifications, available options, samples and production requirements.

Ask about KD011-A3 ↗