
SMART BEDS · OEM / ODM
KR001 Smart Adjustable Bed – Integrated Bed & Mattress, 2000 × 1800
A complete smart bed combining a quiet electric lift system with an integrated mattress. The streamlined one-piece look is suited to contemporary bedroom ranges.
- Quiet actuator with wireless remote
- Back lift 0–55° and leg lift 0–35°
- Integrated mattress; frame is visually concealed
- Knitted quilt, suspension cotton and mini pocket springs
ModelKR001
CategorySmart beds
Size2000 × 1800 mm
CustomizationOEM / ODM available
MADE FOR YOUR PROGRAM
Talk through the details.
Contact our team to discuss specifications, available options, samples and production requirements.