
SMART BEDS · OEM / ODM
KR002 Electric Adjustable Bed – 3D Breathable Mattress, 2000 × 1800
An integrated smart bed pairing independent electric adjustment with a breathable mattress construction. Contact us to discuss upholstery and program requirements.
- Silent actuator with wireless remote
- Back lift 0–55° and leg lift 0–35°
- Integrated mattress with 3D breathable construction
- Independent head and leg adjustment
ModelKR002
CategorySmart beds
Size2000 × 1800 mm
CustomizationOEM / ODM available
MADE FOR YOUR PROGRAM
Talk through the details.
Contact our team to discuss specifications, available options, samples and production requirements.