KR004 Natural Latex Mattress
SMART BEDS · OEM / ODM

KR004 Smart Adjustable Bed – Natural Latex Mattress, King 2000 × 1500

A king-size integrated bed that combines powered adjustment and a natural latex mattress. A premium option for partners building a comfort-led smart sleep range.

  • Quiet actuator with wireless remote
  • Back lift 0–55° and leg lift 0–35°
  • Integrated mattress with natural latex
  • High-strength steel structure; 10,000-cycle tested
Request a quote ↗
ModelKR004
CategorySmart beds
Size2000 × 1500 mm
CustomizationOEM / ODM available
MADE FOR YOUR PROGRAM

Talk through the details.

Contact our team to discuss specifications, available options, samples and production requirements.

Ask about KR004 ↗