
LEISURE CHAIRS · OEM / ODM
YJ001-1 Yoga Chair A01 – Electric Zero-Gravity Recliner, 700 × 1900
An electric zero-gravity yoga recliner for recovery, stretching and relaxed reading. Upholstery, motor and optional USB configurations are available for discussion.
- Backrest 0–60° and legrest 0–45°
- Technology leather upholstery
- V-stretch design supports waist and core workout
- German OKIN motor; wireless remote and USB optional
ModelYJ001-1
CategoryLeisure chairs
Size700 × 1900 × 460 mm
CustomizationOEM / ODM available
MADE FOR YOUR PROGRAM
Talk through the details.
Contact our team to discuss specifications, available options, samples and production requirements.