Solution

Adjustable Bed Solutions for Mattress Brands

Adding an adjustable base is the fastest way for a mattress brand to lift average order value — but the base has to work with your mattress, your brand, and your packaging, not against them.

Adding an adjustable base is the fastest way for a mattress brand to lift average order value — but the base has to work with your mattress, your brand, and your packaging, not against them.

Solution

The challenge

A mattress brand's adjustable base must hold the mattress you already sell, move under it without noise or sag, and arrive in packaging your customer can set up without help.

Solution

The right product fit

  • Bare electric frames that pair with your own mattress and upholstery.
  • Electric mattresses with full-wrap split design for motion-compatible setups.
  • Frame dimensions matched to your mattress spec, not forced onto a standard.
Solution

How KCAI helps

KCAI builds electric bed frames (five base models) and an electric mattress designed to integrate with retail mattress programs. Frames are carbon steel with wood side panels, rated at 250 kg, and available with single, dual, or triple motor configurations to match your price tiers.

FAQ

Frequently asked questions

Do you make a base that works with our existing mattress?

Yes — our frames are built to pair with a mattress program, and dimensions are matched to your spec rather than forcing a standard.

Can the base carry a heavy premium mattress?

Our standard frames are rated at 250 kg combined load, so they handle heavy premium mattresses plus occupants.

Solution

Send Your Mattress Specs

Send Your Mattress Specs ↗